MIB Viewer
MIB Viewer Desktop New

rcSlaConfigSchedulePeriod

OBJECT-TYPE
1.3.6.1.4.1.8886.6.1.36.2.1.1.16
Access
read-create
Status
current
Sub-identifiers
0
This object specifies the duration between two SLA test which includes all of probes schedule process in test. Take above example, if all of the rcSlaConfigSchedulePeriod of three operations are set to 60, then the start time of each test of SLA operation like: start time: T+0 operation1 operation2 operation3 start again: T+60 operation1 operation2 operation3 start 3rd time:T+120 operation1 operation2 operation3
Unsigned32